Northeast 85th Street: Shared Use Pathway
Northeast 85th Street continues to usher a single lane of traffic in each direction, between Interstate 405 and Sixth Street while a Kirkland contractor builds a shared-use pathway that parallel’s Northeast 85th Street.
This traffic control ends at WSDOT’s new roundabout, and that change is dramatic for drivers.
Northeast 85th Street Eastbound 3rd Lane Project
Drivers can expect night construction to continue east of Interstate 405 on Northeast 85th Street. Traffic control begins by 9 p.m. and ends by 5 a.m. to avoid disruption to Northeast 85th Street. Street repairs, grind and overlay along with concrete repairs are expected to continue throughout spring.
116th Avenue Northeast Water Check Valve
Drivers will encounter alternating traffic controlled by flaggers on 116th Avenue Northeast between Northeast 100th Street and Northeast 95th Street. Traffic control is expected between 7 a.m. and 3 p.m. daily.