Holmes Point Drive Stormwater

HOLMES-map
Installation begins Jan. 22 on a stormwater system on Holmes Point Drive. The new stormwater system will increase capacity. The stormwater will flow through these pipes and directly into Lake Washington. The contractor will work 7 a.m. to 4 p.m., Monday through Friday, starting Jan. 22 and finishing in April.

WHAT TO EXPECT: Kirkland’s contractor will control traffic during construction hours throughout the project.   

R.L. Alia, Kirkland’s contractor will, at times, close Holmes Point Drive at the construction site and detour traffic around it.

Mail delivery, emergency response, local residents and waste management will have access.
The project will remove a few trees.

CONTACT: Project Engineer Marius Eugenio, Jr., at (425) 587-3872; meugenio@kirklandwa.gov; Christian Knight, outreach, cknight@kirklandwa.gov, (425) 587-3831.

Public Works
Engineering
123 5th Avenue, Kirkland WA 98033
T. 425-587-3800 | F. 425-587-3807
Mon-Fri, 8 a.m. to 5 p.m.

Operations & Maintenance
915 8th St, Kirkland WA 98033
T. 425-587-3900 24/7 | F. 425-587-3902
Mon-Fri, 6:30 a.m.-3:30 p.m.

General Inquiries - Contact us via the: 
Our Kirkland Customer Service Portal