Skip to main content
Mobile Navigation Icon
Twitter YouTube Print E-mail a friend this page> Share this page

Erosion

EROSION CONTROL PRE-APPROVED PLANS

All details generated by the City of Kirkland's Public Works Department are representations of current standards.  Discrepancies may occur and feedback is welcome, as we are always trying to improve the quality of our details.  Please check with the Public Works Department to see which details are applicable to your project.

Erosion Index & Plan Notes (PDF-183KB)

View Policies

Policy E-1: Use of Temporary Sediment Settling Tanks 

View Plans

The following details were created and are maintained in AutoCAD. They are presented here in .pdf format for viewing and can be inserted into AutoCAD documents.  

Temporary Construction Entrance - Single Family CK-E.01
Temporary Construction Entrance - Plat / Commercial CK-E.02
Silt Fence CK-E.03
Small Site Erosion & Sedimentation Control Plan Example CK-E.04
Temporary Stockpile CK-E.05
Nets, Blankets, and Temporary Stabilization CK-E.06
Check Dam CK-E.07
Catch Basin / Inlet Sedimentation Trap CK-E.08
Temporary Sediment Pond CK-E.09
Temporary Sediment Trap CK-E.09A
Straw Wattles CK-E.10
Storm Drain Protection Insert CK-E.11
Soil Amendment Notes for Ecology BMP T5.13 CK-E.12



If this web page does not meet your needs for Pre-Approved Plans, these items are also available through the Public Works Department. Please call (425) 587-3800 for more information.

 

Public Works
Engineering
Mon-Fri, 8 a.m. to 5 p.m.
123 5th Avenue, Kirkland WA 98033
Operations & Maintenance
Mon-Fri, 6:30 a.m.-3:30 p.m.
915 8th St, Kirkland WA 98033

General Inquiries
E-mail: publicworks@kirklandwa.gov
Engineering: T. 425.587.3800 | F. 425.587.3807
Operations & Maintenance: T. 425.587.3900 | F. 425.587.3902