Skip to main content
Mobile Navigation Icon
Twitter YouTube Print E-mail a friend this page> Share this page

Public Works Development Services

  • Pre-Approved Plans
    Pre-Approved Plans and Policies are to be referred to by any individual or company designing, constructing or maintaining water, sewer, storm drainage, or street improvements in the City of Kirkland.
  • Development
    The Development Engineering Group reviews, permits, and inspects the construction of water, sewer, storm drainage utilities, right-of-way improvements, and erosion control associated with the development of private property.
  • Fees
    Public Works fees that are related to the connection or repair of water, sewer, or storm drainage utilities, work in the public right-of-way, and road impact fees associated with new or change-in-use development of private property.
  • Survey Control
    The City of Kirkland maintains a variety of land survey records that may be of interest to the engineering and surveying communities.
  • Public Works
    Engineering
    Mon-Fri, 8 a.m. to 5 p.m.
    123 5th Avenue, Kirkland WA 98033
    Operations & Maintenance
    Mon-Fri, 6:30 a.m.-3:30 p.m.
    915 8th St, Kirkland WA 98033

    General Inquiries
    E-mail: publicworks@kirklandwa.gov
    Engineering: T. 425.587.3800 | F. 425.587.3807
    Operations & Maintenance: T. 425.587.3900 | F. 425.587.3902