Pre-approved Plans and policies are to be referred to by any individual or company designing, constructing or maintaining water, sewer, storm drainage, or street improvements in the City of Kirkland.
POLICIES
The Public Works Department updates the Pre-approved Plans annually. Our most recent update (PDF) occurred in March 2013.
Download the full document (PDF), or individual plans that have been updated or added by following the link to utility type. All plans will have an edit date listed next to the plan title.
Kirkland adopted the 2009 King County Surface Water Design Manual effective January 2010. Due to size of the design manual, it will not be published as part of the Pre-approved Plans. If you need to purchase a copy of the manual, please contact King County Surface Water Management at 206-296-1900, or download it from their web site. For more information regarding the use of the King County Surface Water Design Manual in the City of Kirkland, please refer to Pre-approved Plan Policy D-2., Surface Water Design Requirements.
What are your thoughts?
We are always striving to provide our customers with the best product. We would appreciate your comments regarding the Pre-approved Plans Book. If you have ideas to improve it, please let us know. We can be reached at 425-587-3800.
All maps generated by the City of Kirkland's Public Works Department are representations of existing conditions. Discrepancies may occur and feedback is welcome, as we are always trying to improve the quality of our maps. The Plans on the City's web page are Pre-Approved Plans. Please check with the Public Works Department to see if they are applicable to your project at this time.
General Policies
Please note: Policies associated with each topic (Erosion, Roadway, Sanitary Sewer, Storm Drain, LID Storm, Traffic Signals, and Water) are located on the corresponding page (see the links on the right).
General Policies Index
- G-1, Easement Width
- G-2, Non-Slip Covers for All Utilities in Pedestrian Areas
- G-3, Construction Record Document Requirements
- G-4, Fueling Station Best Management Practices
- G-5, Adequate Legal Descriptions
- G-6, Utility Policy
- G-7, Engineering Plan Requirements
- G-8, Public Works Permit Review Checklist
- G-9, Garbage and Recycling Receptacles & Enclosures
Back to Top
View Plans
The following details were created and are maintained in AutoCAD. They are presented here in .pdf format (Adobe Acrobat) for viewing and can be inserted into AutoCAD documents.
|
Plan name
|
Download
PDF
|
| Container Enclosures Updated 3/09 |
CK-G-1
|
WMI Truck Turning Radius Template
Updated 3/09 |
CK-G-2
|
If, for any reason, this web page does not meet your needs for geographic information or Pre-Approved Plans, these items are also available through the Public Works Department.
Please call (425) 587-3800 for more information.
If you have any questions on the Pre-Approved Plans or geographic information, please send email to pwmaps@kirklandwa.gov.
|
PRE-APPROVED
PLANS
Erosion Control
Roadways
Sanitary Sewer
Storm Drainage
LID Storm Facilities
Traffic Signals
Water
|