Construction Projects

CIP-BANNER-2017
Welcome to  Kirkland's Capital Improvement Program, the program that continues to lay the groundwork for a safe, healthy and vibrant community. The projects this program is currently managing to keep our community safe, healthy and vibrant are listed below. You can see these projects and others in Kirkland's 2017 - 2022 Capital Improvement Program or view them on the Capital Improvement Program interactive map.

Latest CIP News
LEVY-streets-20172017 Streets Levy
Accountability Report

 This document reports on taxpayers' return on their investment in the streets levy.
TOTEM-LAKE-magazine-coverProgress in Totem Lake 
The magazine includes feature stories about Totem Lake Park, the Totem Lake Connector and progress reports on 26 capital and private development projects that, together, are implementing the vision of Totem Lake as a walkable, vibrant and green urban village.
DIGEST-spring-2019-thumbnailThis document includes more than 20 descriptions of capital projects that are currently in the design or construction phase. 

 


List of construction projects
Project Name Location Project Type Project Phase
 CROSS KIRKLAND CORRIDOR RAIN GARDEN Highlands Stormwater Construction
Project Name Location Date Begins Date Ends
141st ST/111th AVE CULVERT REPLACEMENT
Juanita
Stormwater
Design
MARKET STREET STORMWATER REHABILITATION
Market  Stormwater Construction
100TH AVENUE NORTHEAST CORRIDOR DESIGN
Juanita Street, Intersection, Ped/Bike, Storm Drain Design
WATER MAIN UPGRADES: Northeast 112th, 113th streets and 104 Avenue Northeast
Juanita Water Design
NORTHEAST 132ND STREET IMPROVEMENTS
Kingsgate Bicycle, intersection
 Design
132ND SQUARE PARK IMPROVEMENTS
 Kingsgate Park, Stormwater Design
ELEMENTARY SCHOOL WALK ROUTE ENHANCEMENTS
Highlands, Juanita, North Rose Hill Ped/Bike Design
FIRE STATION 25
Finn Hill Public Safety Construction
6TH STREET IMPROVEMENTS
Everest Water, Sewer, Intersection Construction
124TH AVENUE NORTHEAST IMPROVEMENTS
North Rose Hill, Totem Lake
Ped/Bike, intersection
Design
GREENWAYS
North Rose Hill, South Rose Hill Ped/Bike Design
LAKEFRONT BICYCLE AND PEDESTRIAN IMPROVEMENTS Juanita, Lakeview, Market, Moss Bay, Norkirk Ped/Bike Construction
PAVEMENT MARKING PROGRAM   Ped/Bike, Street, Intersection Complete
ROSE POINT LIFT STATION Market  Sewer Design
SIDEWALK PRESERVATION   Ped/Bike Design
SLURRY SEAL Kingsgate, North Rose Hill
Street Suspended
STREET PRESERVATION Finn Hill, Kingsgate, Moss Bay, Norkirk, North Rose Hill, South Rose Hill
Street  Complete
TOTEM LAKE CONNECTOR Totem Lake Ped/Bike Design
NEIGHBORHOOD SAFETY PROGRAM Central Houghton, Everest, Evergreen Hill, Finn Hill, Highlands, Juanita, Lakeview, Market, Moss Bay, Norkirk, North Rose Hill, South Rose Hill, Totem Lake Ped/Bike, Intersection Design
NORTHEAST 116TH STREET/124TH AVENUE NORTHEAST DUAL LEFT TURN LANES
North Rose Hill, Totem Lake
Intersection Design
WATER MAIN UPGRADE: Third Street
Juanita Water Complete
JUANITA BEACH BATHHOUSE
Juanita Park Design
TOTEM LAKE PARK DEVELOPMENT PHASE I Totem Lake Park Design
PLEASANT BAY STORMWATER Moss Bay  Stormwater Design
HOLMES POINT DRIVE PIPE REPLACEMENT Finn Hill Storm Complete
WILLOWS ROAD REGIONAL TRAIL CONNECTION Totem Lake Ped/Bike Design
TOTEM LAKE GATEWAY: Totem Lake Boulevard, 120th Avenue Northeast
Totem Lake Ped/Bike/Intersection Design
KIRKLAND AVENUE WATER & SEWER Everest  Water/Sewer Design
COMFORT INN POND MODIFICATIONS  Totem Lake Stormwater Design

GLOSSARY

PED/BIKE: Refers to projects that improve transportation infrastructure for walking or bicycling. These projects can include street paving, which can create new--or improve existing--bicycle lanes.

STREET: Refers to projects that improve the functionality of existing streets, such as overlay (repaving) or slurry seal projects.

INTERSECTION: Refers to projects that improve traffic flow, most often with intersection improvements. These projects can include traffic signal upgrades to Intelligent Transportation Systems technology or adding turn-lanes at intersections.

SEWER: Refers to projects that add life or capacity to sewer systems.

PARK: Refers to projects aimed at improving safety or the public's experience at any of the City of Kirkland's parks.

STORM DRAIN: Refers to projects aimed at mitigating stormwater runoff caused by impervious surfaces, such as sidewalk, parking lots and roofs.

WATER: Refers to projects that add life or capacity to water systems.

Public Works
Engineering
Mon-Fri, 8 a.m. to 5 p.m.
123 5th Avenue, Kirkland WA 98033
Operations & Maintenance
Mon-Fri, 6:30 a.m.-3:30 p.m.
915 8th St, Kirkland WA 98033

General Inquiries - Contact us via the: 
Our Kirkland Customer Service Portal

Engineering: T. 425.587.3800 | F. 425.587.3807
Operations & Maintenance: T. 425.587.3900 | F. 425.587.3902