Construction Projects

CIP-BANNER-2017
Kirkland Email Alert GraphicWelcome to  Kirkland's Capital Improvement Program, the program that continues to lay the groundwork for a safe, healthy and vibrant community. The projects this program is currently managing to keep our community safe, healthy and vibrant are listed below. You can see these projects and others in Kirkland's 2019 - 2024 Capital Improvement Program or view them on the Capital Improvement Program interactive map.

Latest CIP News

LEVY-streets-20182018 Streets Levy
Accountability Report

 This document reports on taxpayers' return on their investment in the streets levy.

TOTEM-LAKE-magazine-coverProgress in Totem Lake 
The magazine includes feature stories about Totem Lake Park, the Totem Lake Connector and progress reports on 26 capital and private development projects that, together, are implementing the vision of Totem Lake as a walkable, vibrant and green urban village.

DIGEST-fall-2019Project Digest 
This document includes more than 20 descriptions of capital projects that are currently in the design or construction phase.

List of construction projects
Project NameLocationProject TypeProject Phase
Project NameLocationDate BeginsDate Ends
141st ST/111th AVE CULVERT REPLACEMENT Juanita Stormwater Construction
CROSS KIRKLAND CORRIDOR HEADWALL Highlands Stormwater Construction
100TH AVENUE NORTHEAST CORRIDOR DESIGN Juanita Street, Intersection, Ped/Bike, Storm Drain Design
NORTHEAST 132ND STREET SIDEWALK  Finn Hill  Ped/Bike Design
CHAMPAGNE CREEK RAIN GARDEN  Finn Hill Stormwater Construction
NORTHEAST 132ND STREET IMPROVEMENTS Kingsgate Bicycle, intersection  Design
132ND SQUARE PARK IMPROVEMENTS  Kingsgate Park, Stormwater Design
ELEMENTARY SCHOOL WALK ROUTE ENHANCEMENTS Highlands, Juanita, North Rose Hill Ped/Bike Construction
6TH STREET IMPROVEMENTS Everest Water, Sewer, Intersection Construction
124TH AVENUE NORTHEAST IMPROVEMENTS North Rose Hill, Totem Lake Ped/Bike, intersection Construction
GREENWAYS North Rose Hill, South Rose Hill Ped/Bike Design
GOAT HILL STORMWATER Juanita Stormwater Construction
PAVEMENT MARKING PROGRAM   Ped/Bike, Street, Intersection Design
ROSE POINT LIFT STATION Market  Sewer Design
STREET PRESERVATION Finn Hill, Kingsgate, Moss Bay, Norkirk, North Rose Hill, South Rose Hill Street  Construction
TOTEM LAKE CONNECTOR Totem Lake Ped/Bike Design
NEIGHBORHOOD SAFETY PROGRAM Central Houghton, Everest, Evergreen Hill, Finn Hill, Highlands, Juanita, Lakeview, Market, Moss Bay, Norkirk, North Rose Hill, South Rose Hill, Totem Lake Ped/Bike, Intersection Design
NORTHEAST 116TH STREET/124TH AVENUE NORTHEAST DUAL LEFT TURN LANES North Rose Hill, Totem Lake Intersection Construction
WATER MAIN UPGRADE: Third Street Juanita Water Construction
JUANITA BEACH BATHHOUSE Juanita Park Design
TOTEM LAKE PARK DEVELOPMENT PHASE I Totem Lake Park Design
WILLOWS ROAD REGIONAL TRAIL CONNECTION Totem Lake Ped/Bike Design
TOTEM LAKE GATEWAY: Totem Lake Boulevard, 120th Avenue Northeast Totem Lake Ped/Bike/Intersection Construction
KIRKLAND AVENUE WATER & SEWER Everest  Water/Sewer Construction
COMFORT INN POND MODIFICATIONS  Totem Lake Stormwater Design

 

GLOSSARY

PED/BIKE: Refers to projects that improve transportation infrastructure for walking or bicycling. These projects can include street paving, which can create new--or improve existing--bicycle lanes.

STREET: Refers to projects that improve the functionality of existing streets, such as overlay (repaving) or slurry seal projects.

INTERSECTION: Refers to projects that improve traffic flow, most often with intersection improvements. These projects can include traffic signal upgrades to Intelligent Transportation Systems technology or adding turn-lanes at intersections.

SEWER: Refers to projects that add life or capacity to sewer systems.

PARK: Refers to projects aimed at improving safety or the public's experience at any of the City of Kirkland's parks.

STORM DRAIN: Refers to projects aimed at mitigating stormwater runoff caused by impervious surfaces, such as sidewalk, parking lots and roofs.

WATER: Refers to projects that add life or capacity to water systems.

Public Works
Engineering
123 5th Avenue, Kirkland WA 98033
T. 425-587-3800 | F. 425-587-3807
Mon-Fri, 8 a.m. to 5 p.m.

Operations & Maintenance
915 8th St, Kirkland WA 98033
T. 425-587-3900 24/7 | F. 425-587-3902
Mon-Fri, 6:30 a.m.-3:30 p.m.

General Inquiries - Contact us via the: 
Our Kirkland Customer Service Portal