• Improve Safe School Walk Route |
| • Provide Continuous Sidewalk Facilities |
| • Enhance the Pedestrian Experience |
|
Project Overview: Install approximately 620 feet of five-foot sidewalk along the south side of NE 100th Street. Project will consist of concrete curb, gutter and planter strip with street trees. Project will complete a critical link in the non-motorized facilities between North Rose Hill and Lake Washington -- the NE 100th Street ped/bike overpass of I-405 is located immediately to the east of this project and plans for continuing this corridor are proposed as the Crestwoods Park/BNSFRR Ped/Bike Facility (NM 0031 currently unfunded).
What to Expect: Expect restricted parking along the roadway. No-parking signs will be posted 24 hours in advance of all parking restrictions. During construction, there may be inconvenience associated with driving through the work zone; traffic control and flagging operations will be in effect. Emergency vehicle access will be maintained throughout the construction process. The contractor is required to back fill and/or cover their work at the end of each day so there will be no open trenches left over night.
When: This project is currently in the design phase. Currently not funded for construction. | |
|
|
Caring for your infrastructure to keep Kirkland healthy, safe and vibrant.