South Rose Hill/Bridle Trails Neighborhood Connection Projects

Neighborhood Connection Program 1999-2010:

The Neighborhood Connection Program invited residents to learn about City services, ask questions, and suggest neighborhood improvements. The purpose of the program was to:
  • Provide neighborhoods with the resources to address neighborhood needs.
  • Strengthen the relationship between City Hall and the neighborhoods.
  • Support neighborhood associations in expanding their membership.
  • Increase awareness of the City’s neighborhood services.
  • Build partnerships to improve Kirkland’s neighborhoods.

Every three years, neighborhood residents were given the opportunity to identify and prioritize improvements to their neighborhood. In ten years, over a million dollars of improvements (90 projects) were completed. City Council allocated $25,000 for each neighborhood’s top priority projects. Due to the economic downturn in 2010, the program was eliminated.

Residents are still invited to suggest Capital Improvement Projects (CIP) as the City prepares its six-year Capital Improvement Program.


 
Park Improvement/Project #87

Project 87a Project 87b Project 87c

Project Year: 2008
Location: Rose Hill Meadows Park
Description: Select and locate public art or low maintenance labyrinth at Rose Hill Meadows Park.
Cost: $9,600



Street Lights/Project #86

SR_Project 86

Project Year: 2008
Locations: 122nd Ave NE and NE 68th Street
125th Ave NE (between NE 65th and NE 70th Streets)
Description: Add four street lights on existing power poles:
One street light on 122nd Ave NE. Three street lights on 125th Ave NE.
Cost: $2,000


Benches/Project #85

Project 85

Project Year: 2008
Locations: Suggested locations include NE 70th Street (between 116th Ave NE and 132nd Ave NE), NE 80th Street (Rose Hill Elementary), and NE 60th Street (Ben Franklin Elementary playfields).
Description: Install seven benches at various locations.
Cost: $8,400



 

Traffic Calming/Project #84

SRHBT_Project 84

Project Year: 2008
Locations: NE 60th Street (Ben Franklin Elementary)
Description: Install two permanent radar signs. Cost estimate is for two signs but actual cost will depend upon available power. Before signs are purchased, the Public Works Department will test this method for effectiveness with a portable/temporary radar sign.
Cost: $20,000


 

Traffic Calming/Project #83

Project 83

Project Year: 2008
Locations: 122nd Ave NE (between NE 70th and NE 80th Streets)
Description: Install two permanent radar signs. Cost estimate is for two signs but actual cost will depend upon available power. Before signs are purchased, the Public Works Department will test this method for effectiveness with a portable/temporary radar sign.
Cost: $20,000


 

Crosswalk Improvement/Project #82

SRH_Project 82

Project Year: 2008
Locations: NE 60th Street (Ben Franklin Elementary)
Description: Install flashing beacon at crosswalk.
Cost: $6,000


 

Park Improvement/Project #45

 SRH_BT Project 45
 

Project Year: 2004
Location: NE 70th St and 128th Ave NE (South Rose Hill Park)
Description: Installed two picnic tables/benches for neighborhood picnics and gatherings.
Cost: $5,000



Neighborhood Speed Watch/Project #44

SRoseHill Project 44

Project Year:
2004
Location: South Rose Hill Neighborhood
Description: Purchased radar equipment, supplies, and signs for Neighborhood Speed Watch Radar Patrol volunteers.
Cost: $4,000


 
Benches/Project #43

SRoseHill Project 43

Project Year:
2004
Locations: NE 70th St (at 120th Ave NE and 130th Ave NE)
NE 80th St (at 120th Ave NE)
Description: Installed benches along arterial for pedestrians.
Cost: $4,200



Neighborhood Entrance Improvement/Project #42

SRoseHill Project 42

Project Year:
2004
Location: NE 70th St and 117th Pl NE
Description: Landscaped around the Bridle Trails Neighborhood sign.
Cost: $4,000



Street Lights/Project #41

SRoseHill Project 41

Project Year:
2004
Locations: NE 73rd St (between 128th and 132nd Ave NE)
NE 65th Lane and 125th Ave NE
Description: Installed street lighting to improve pedestrian safety.
Cost: $2,000



Crosswalk Improvement/Project #15

SRH Project 15

Project Year:
2001
Location: 132nd Ave NE and NE 75th St 
Description: Enhanced crosswalk by installing bump outs and pedestrian flags.
Cost: $25,000